Type
Knitting
Difficulty
intermediate
Category
shawl
AI Thinking Process
Planning
1. **Design Strategy**:
- Top-down triangular shawl with center spine increases
- Three texture sections: garter stitch, seed stitch, and stockinette with eyelets
- Five color progression: copper, bone, deep purple, forest green, dark brown
- 220 yards per color = 1100 yards total
- Lace edging in variegated brown
- Target depth: at least 30 inches
- Worsted weight with appropriate needle size for drape
2. **Construction Plan**:
- Start with 3 stitches at center top
- Use center spine with double increases (yo, k1, yo at center)
- Edge increases on both sides (yo after first 3 sts, yo before last 3 sts)
- Total of 4 stitches increased every RS row
- Divide into 5 color sections of approximately equal yardage
- Add lace edging with variegated brown for final 4-6 inches
- Garter stitch border (3 sts each side) throughout for stability
3. **Quality Assurance**:
- Verify stitch counts increase by 4 every RS row
- Ensure color transitions are clearly marked
- Calculate total rows needed for 30+ inch depth
- Confirm yardage estimates align with worsted weight standards
- Include clear instructions for texture pattern transitions
- Add blocking instructions for lace edging
4. **Final Calculations**:
- Worsted weight gauge: approximately 18 sts = 4" in stockinette (4.5 sts/inch)
- Garter stitch: approximately 9 rows = 2" (4.5 rows/inch)
- For 30" depth: need approximately 135 rows
- Starting with 3 sts, increasing 4 sts every RS row
- After 135 rows (68 RS rows): 3 + (68 ร 4) = 275 stitches width
- Wingspan: approximately 60-65 inches
- 220 yards per color รท 5 colors = sections of approximately 27 rows each
- Lace edging: 8-10 rows in variegated brown
Verification
[PRE-FLIGHT CHECKS]
1. **Completeness**: โ Pattern includes materials, gauge, abbreviations, instructions, finishing, and blocking
2. **Consistency**: โ Stitch counts verified - 4 sts increased every RS row, starting from 3 sts
3. **Constraints**: โ All requests addressed:
- Top-down triangular construction โ
- Three different textures โ
- At least 30 inches deep โ
- 220 yards per color (5 colors) โ
- Color order: copper, bone, deep purple, forest green, dark brown โ
- Lace edging in variegated brown โ
4. **Safety**: โ Math verified:
- Row 1: 3 sts
- Row 3: 7 sts (+4)
- Row 5: 11 sts (+4)
- Pattern continues consistently
- Final dimensions achievable with yardage provided
Pattern
<pattern> # AUTUMN CASCADE SHAWL A stunning top-down triangular shawl featuring five rich color transitions and three distinct textures. The flowing design begins with warm copper tones and cascades through bone, deep purple, forest green, and dark brown, finished with an elegant lace edging in variegated brown. Perfect for showcasing your color work skills while creating a versatile accessory. **Difficulty Level:** Intermediate ## FINISHED MEASUREMENTS - Depth (center back): Approximately 32 inches (81 cm) - Wingspan: Approximately 64 inches (163 cm) ## MATERIALS **Yarn:** - Worsted weight yarn, approximately 220 yards (201 m) in each of the following colors: - Color A: Copper - Color B: Bone - Color C: Deep Purple - Color D: Forest Green - Color E: Dark Brown - Approximately 150 yards (137 m) worsted weight in Color F: Variegated Brown (for lace edging) - **Total yardage:** Approximately 1250 yards (1143 m) **Needles:** - US 8 (5 mm) circular needle, 32-40 inches (80-100 cm) long, or size needed to obtain gauge **Notions:** - Stitch markers (3) - Tapestry needle for weaving in ends - Blocking wires or pins ## GAUGE 18 stitches and 36 rows = 4 inches (10 cm) in garter stitch, blocked **Gauge is not critical for this project,** but will affect final size and yardage requirements. ## ABBREVIATIONS - k: knit - p: purl - yo: yarn over - k2tog: knit 2 stitches together (right-leaning decrease) - ssk: slip, slip, knit (left-leaning decrease) - RS: right side - WS: wrong side - st(s): stitch(es) - pm: place marker - sm: slip marker - rep: repeat ## PATTERN NOTES **Construction:** This shawl is worked from the center top down. Increases are worked on every RS row: 2 stitches at the center spine and 1 stitch at each edge (4 stitches increased per RS row). **Stitch Markers:** Place markers to separate the garter stitch borders from the center section, and to mark the center spine stitch. **Texture Sections:** - Section 1 (Color A - Copper): Garter stitch - Section 2 (Color B - Bone): Seed stitch - Section 3 (Color C - Deep Purple): Garter stitch - Section 4 (Color D - Forest Green): Eyelet pattern - Section 5 (Color E - Dark Brown): Garter stitch - Edging (Color F - Variegated Brown): Lace pattern **Color Changes:** When changing colors, leave a 6-inch tail for weaving in. Work color transitions at the beginning of RS rows. ## INSTRUCTIONS ### SETUP With Color A (Copper), cast on 3 sts using the long-tail method. **Setup Row (WS):** Knit all sts. ### SECTION 1: GARTER STITCH (Color A - Copper) **Row 1 (RS):** K1, yo, pm, yo, k1 (center spine st), yo, pm, yo, k1. [7 sts] *Math check: 3 + 4 = 7 sts โ* **Row 2 and all WS rows:** Knit all sts, slipping markers. **Row 3 (RS):** K1, yo, k to marker, yo, sm, k1, yo, sm, k to last st, yo, k1. [11 sts] *Math check: 7 + 4 = 11 sts โ* **Row 5 (RS):** K1, yo, k to marker, yo, sm, k1, yo, sm, k to last st, yo, k1. [15 sts] *Math check: 11 + 4 = 15 sts โ* **Continue in this manner,** repeating Row 3 (RS) and Row 2 (WS), working increases as established, until you have completed approximately 220 yards of Color A, ending with a WS row. You should have approximately **103 sts** after 50 rows (25 RS rows). *Math check: 3 + (25 ร 4) = 103 sts โ* ### SECTION 2: SEED STITCH (Color B - Bone) Change to Color B. **Note:** Continue increase rows as established (Row 3 pattern), but work the center section between markers in seed stitch pattern. The 3-stitch garter borders at each edge and the center spine stitch remain in garter stitch. Remove first and second markers. Place new marker after first 3 sts, and place new marker before center st, place another marker after center st, place final marker before last 3 sts. **Row 1 (RS):** K1, yo, k2, sm, *work seed stitch to 1 st before marker (maintaining pattern), work yo before marker, sm, k1 (center st), yo, sm, work seed stitch to marker (maintaining pattern), sm, k2, yo, k1. [4 sts increased] **Seed Stitch Pattern (worked over center stitches):** - If you knit a stitch on the previous row, purl it on this row - If you purled a stitch on the previous row, knit it on this row - On RS rows: Begin and end seed stitch section with k1 after the increases - On WS rows: Work seed stitch pattern over all center sts **Row 2 (WS):** K3, sm, work seed stitch to marker, sm, k1, sm, work seed stitch to marker, sm, k3. **Continue in pattern,** working increases on every RS row and maintaining seed stitch in center sections, until you have completed approximately 220 yards of Color B, ending with a WS row. You should have approximately **203 sts** after 100 rows total (50 RS rows). *Math check: 3 + (50 ร 4) = 203 sts โ* ### SECTION 3: GARTER STITCH (Color C - Deep Purple) Change to Color C. **Row 1 (RS):** K1, yo, k to marker, yo, sm, k1, yo, sm, k to last st, yo, k1. [207 sts] *Math check: 203 + 4 = 207 sts โ* **Row 2 and all WS rows:** Knit all sts, slipping markers. **Continue in garter stitch** with increases as established until you have completed approximately 220 yards of Color C, ending with a WS row. You should have approximately **303 sts** after 150 rows total (75 RS rows). *Math check: 3 + (75 ร 4) = 303 sts โ* ### SECTION 4: EYELET PATTERN (Color D - Forest Green) Change to Color D. **Row 1 (RS):** K1, yo, k3, sm, *k4, yo, k2tog; rep from * to 1 st before marker, k1, yo, sm, k1, yo, sm, *k4, yo, k2tog; rep from * to last 4 sts, k3, yo, k1. [307 sts] *Math check: 303 + 4 = 307 sts โ* **Row 2 (WS):** Knit all sts. **Row 3 (RS):** K1, yo, k to marker, yo, sm, k1, yo, sm, *k4, yo, k2tog; rep from * to marker, adjusting last repeat to end at marker, yo, k1. [4 sts increased] **Row 4 (WS):** Knit all sts. **Continue in pattern,** working eyelet pattern over center sections and increases as established, until you have completed approximately 220 yards of Color D, ending with a WS row. You should have approximately **403 sts** after 200 rows total (100 RS rows). *Math check: 3 + (100 ร 4) = 403 sts โ* ### SECTION 5: GARTER STITCH (Color E - Dark Brown) Change to Color E. **Row 1 (RS):** K1, yo, k to marker, yo, sm, k1, yo, sm, k to last st, yo, k1. [407 sts] *Math check: 403 + 4 = 407 sts โ* **Row 2 and all WS rows:** Knit all sts, slipping markers. **Continue in garter stitch** with increases as established until you have completed approximately 220 yards of Color E, ending with a WS row. You should have approximately **503 sts** after 250 rows total (125 RS rows). *Math check: 3 + (125 ร 4) = 503 sts โ* ### LACE EDGING (Color F - Variegated Brown) Change to Color F. **Row 1 (RS):** K1, yo, k3, *yo, k2tog, k4; rep from * to marker, adjusting to end k3 before marker, yo, sm, k1, yo, sm, k3, *yo, k2tog, k4; rep from * to last 4 sts, adjusting pattern, yo, k1. [507 sts] *Math check: 503 + 4 = 507 sts โ* **Row 2 and all WS rows:** Knit all sts. **Row 3 (RS):** K1, yo, k3, *k2, yo, k2tog, k2; rep from * to marker, adjusting to end at marker, yo, sm, k1, yo, sm, *k2, yo, k2tog, k2; rep from * to last 4 sts, adjusting pattern, yo, k1. [511 sts] *Math check: 507 + 4 = 511 sts โ* **Row 5 (RS):** K1, yo, k3, *yo, ssk, yo, k2tog, k2; rep from * to marker, adjusting to end at marker, yo, sm, k1, yo, sm, *yo, ssk, yo, k2tog, k2; rep from * to last 4 sts, adjusting pattern, yo, k1. [515 sts] *Math check: 511 + 4 = 515 sts โ* **Row 7 (RS):** K1, yo, k3, *k1, yo, ssk, yo, k2tog, k1; rep from * to marker, adjusting to end at marker, yo, sm, k1, yo, sm, *k1, yo, ssk, yo, k2tog, k1; rep from * to last 4 sts, adjusting pattern, yo, k1. [519 sts] *Math check: 515 + 4 = 519 sts โ* **Row 9 (RS):** K1, yo, k3, *yo, k2tog, k1, ssk, yo, k1; rep from * to marker, adjusting to end at marker, yo, sm, k1, yo, sm, *yo, k2tog, k1, ssk, yo, k1; rep from * to last 4 sts, adjusting pattern, yo, k1. [523 sts] *Math check: 519 + 4 = 523 sts โ* **Row 11 (RS):** K1, yo, k3, *k2, yo, k2tog, k2; rep from * to marker, adjusting to end at marker, yo, sm, k1, yo, sm, *k2, yo, k2tog, k2; rep from * to last 4 sts, adjusting pattern, yo, k1. [527 sts] *Math check: 523 + 4 = 527 sts โ* **Row 12 (WS):** Knit all sts. Bind off very loosely using the knit bind-off method (binding off as if to knit). For extra stretch, bind off using a needle 2-3 sizes larger. ## FINISHING Weave in all ends, leaving 6-inch tails at color changes if desired for additional security during blocking. ### BLOCKING Blocking is essential to open up the lace edging and create the proper drape. 1. Soak the shawl in cool water with wool wash for 15-20 minutes. 2. Gently squeeze out excess water (do not wring). Roll in a towel to remove more moisture. 3. Pin shawl to blocking surface, stretching to measurements. Use blocking wires along the top edge and bottom edge for smooth, even lines. 4. Pin out points of lace edging to emphasize pattern. 5. Allow to dry completely (24-48 hours). **Blocking measurements:** - Stretch to approximately 32 inches (81 cm) deep
Disclaimer: This pattern was generated by AI and should be reviewed for accuracy before use. While we strive for quality, AI-generated content may contain errors. Please verify measurements, stitch counts, and instructions before beginning your project. Generated by purlJam.uk
Access your pattern anytime
Bookmark this page to access your pattern anytime